Liandong Middle School Wavy Rostrum Canopy Project
Liandong Middle School wavy rostrum canopy: utilized dual-crane integral lifting and PVDF fabric to guarantee a fast, zero-noise campus installation.
Emplacement
Wenchang City, China
Couverture (M²)
224㎡
Vitesse du vent
120 km/h
Date complète
07/2021
Aperçu du projet
Project Location: Liandong Middle School, Wenchang City
Coverage Area: 224 square meters
Completion Date: July 2021
Building Type: Wavy Tensile Membrane Canopy
Project Background: Situated adjacent to the school’s sports field, this project primarily serves as the canopy for the rostrum. The overall design features an elegant wavy appearance, providing teachers and students with essential shade and rain protection while significantly enhancing the visual appeal of the entire sports facility.
Visualisation du dessin
Visualisation avant fabrication
Design & Rendu
Défi - Solution
Challenge: High Elevation, Tight Schedule & Campus Construction Limits
Due to the relatively high design elevation of the canopy and a tight delivery schedule, the construction team faced considerable pressure. Furthermore, because the site was located within the campus, the school administration imposed strict limitations on construction hours and noise levels. Traditional high-altitude scaffold assembly could not meet these rigid requirements.
Jutent Solution: Ground Pre-Assembly & Dual-Crane Integral Lifting
To ensure low-noise and high-efficiency execution within the specified timeframe, we adopted an “integral lifting” installation strategy. The engineering team first completely assembled the wavy steel framework on the ground. Once pre-assembly was finished, two cranes were deployed to synchronously hoist and position the entire structure in a single operation. This solution perfectly bypassed the noise and safety hazards associated with prolonged high-altitude construction.
Installation - Support
Premium Materials & Efficient Delivery: The canopy utilized a 1050g/㎡ PVDF architectural membrane, renowned for its outstanding weather resistance and self-cleaning capabilities. During the critical construction phases, Jutent dispatched dedicated installation engineers to provide full-process on-site guidance. Thanks to the highly coordinated integral lifting plan, we firmly guaranteed the construction schedule, successfully completing and delivering a high-quality facility to the client.
| Spécification | ||
|---|---|---|
| Fabric Type | PVDF | |
| Type de structure | Structure en treillis | |
| Charge de conception | 120 km/h | |
| Durée de vie de conception | 25-30 ans | |
| Garantie | 10 ans | |
Obtenez une conception & un devis gratuits
Nos ingénieurs vous répondront sous 24 heures
Contacter via WhatsApp
Projets connexes
Cette installation PVDF courbée à double sommet à Dongguan résiste à des vents de 160 km/h tout en couvrant une scène de parc de 286㎡. Le système d'auvent de scène offre une esthétique améliorée et une protection durable du toit d'amphithéâtre pour les visiteurs.
Conçue pour optimiser la diffusion de la lumière naturelle, cette installation à treillis à tirants couvre 2968㎡ d'un équipement sportif à Guangzhou. L'auvent de la tribune du stade utilise un matériau PTFE de 1300 g/㎡ pour assurer une protection à longue portée pour les spectateurs sportifs.
Les représentations en plein air dans les parcs publics de Floride sont protégées par cette installation de 830 m² en treillis d'acier courbé. Le toit de l'amphithéâtre utilise un matériau PTFE de haute qualité de 1300 g/m² pour offrir une protection permanente contre le soleil et la pluie.
Cette installation PVDF à trois arches à Heyuan offre 184 m² de protection essentielle contre les intempéries pour les tribunes du campus. Le système de toit du stade est conçu pour une scène de tension et une utilisation à long terme dans les installations scolaires.