Membrane Landscape Structure for Tovuz Municipal Plaza

This swallow-inspired soft-edge installation adds a distinctive architectural identity to a 300㎡ municipal plaza in Azerbaijan. The Membrane Landscape Structure uses fire-rated PVDF fabric for reliable and aesthetic urban shading.

Location

Tovuz, Azerbaijan

Coverage(M²)

300㎡

Wind Speed

Wind 120 km/h

Complete Date

11/2019

Project Reality

Photo Gallery of the Completed Structure
Case Photos

Project Overview

This project is located in front of the Municipal Service Building in Tovuz City, Azerbaijan, and was completed in November 2019. It is a landscape tensile membrane structure inspired by the form of a flying swallow. The structure consists of multiple triangular soft-edge tensile membranes in varying sizes, primarily serving as a visual landmark while also providing partial sun shading. The steel structure is treated with an epoxy zinc-rich primer and a white finish coat, significantly enhancing durability and corrosion resistance. The roof is covered with 1100 g/㎡ white PVDF architectural membrane, featuring B1 fire-retardant performance and complying with public building safety standards.

Drawing Visualization

Visualizing before fabrication
Design & Renderings

Challenge - Solution

Located in the forecourt of the municipal service building, the client aimed to introduce a landscape-oriented tensile membrane structure with a natural and dynamic appearance to enhance the overall spatial image, while also offering basic shading and allowing for potential commercial use. The project was positioned as a primarily landscape-focused membrane structure feature. Based on the site conditions and functional requirements, our team proposed a swallow-inspired soft-edge tensile membrane design, creating a lightweight and elegant visual effect that integrates well with the surrounding urban environment.

On-site Execution

Fabrication & Installation phases
Construction Process

Installation - Support

During the construction phase, our company dispatched experienced engineers to provide on-site installation guidance. The main technical challenges involved precise control of inclined columns and accurate fixation of the steel cables for the soft-edge membrane. Through close coordination with the local installation team, the project was completed successfully and delivered on schedule.
Specification
Fabric Type PVDF
Frame Type Tensegrity / Cable-Truss
Design Load Wind 120 km/h
Design Life 25-30 Yrs
Warranty 10 Years

Get Free Design & Quote

Our engineers will respond within 24 hours
Inquiry Form Portfolio
Contact Via Whatsapp

Leave Us a message

Our Specialist will reply you within 24 hours on working days

Inquiry Form Pop Up
×
Support
Support Team
               

Hello! 👋 How can we help you today?

WhatsApp
Call Us Now
Email Support
WhatsApp Call Inquiry Email