University Walkway Canopy for Guangxi Minzu Campus Project

Located over a lakeside bridge in Nanning, this curved steel and PVDF structure enhances university campus circulation. The University Walkway Canopy protects a 366㎡ path while providing structural stability and optimized drainage.

Location

Nanning, China

Coverage(M²)

366㎡

Wind Speed

Wind 120 km/h

Complete Date

12/2022

Project Reality

Photo Gallery of the Completed Structure
Case Photos

Project Overview

This project is located at Guangxi Minzu University in Nanning, Guangxi, China, and was completed in December 2022. It is a pedestrian walkway tensile membrane canopy installed on an existing bridge along a lakeside area. The canopy measures approximately 60 m × 6 m with a central height of about 3 m, covering a total projected area of around 360 sqm. The steel structure consumes approximately 7 tons of steel. The steel framework is protected with an epoxy zinc-rich primer and a yellow topcoat, providing enhanced durability and corrosion resistance. The roofing material is a white PVDF architectural membrane with a weight of 1100 g/sqm and a B1 fire rating, fully compliant with safety standards for public buildings.

Drawing Visualization

Visualizing before fabrication
Design & Renderings

Challenge - Solution

The pedestrian walkway serves as a key passage connecting teaching buildings and student dormitories and is located beside a lake. To improve daily circulation comfort and provide sun and rain protection, the university decided to install a canopy along the walkway. The client specified clear requirements: A functional canopy with a modern architectural appearance Structural integration with the existing bridge and surrounding environment Compliance with wind load safety standards During the design phase, our team held multiple technical discussions with the client. Based on site conditions and functional needs, a tensile membrane structure composed of curved steel tubes was proposed. While ensuring practical performance, the design highlights the artistic flexibility of curved membrane structures. Comprehensive structural analysis and safety calculations were conducted, and the final design was approved after verification.

On-site Execution

Fabrication & Installation phases
Construction Process

Installation - Support

Installation was carried out by our engineering team on site. Due to the lakeside bridge location, access for large machinery was limited, so a scissor lift was used for sectional assembly and welding. During construction, pedestrian traffic was temporarily diverted to ensure safety. With professional on-site installation and coordination, the project was successfully completed and delivered on schedule. The canopy not only improves pedestrian comfort but also enhances the campus landscape. The client highly recognized our integrated service covering design, fabrication, and on-site technical support.
Specification
Fabric Type PVDF
Frame Type Frame Structure
Design Load Wind 120 km/h
Design Life 25-30 Yrs
Warranty 10 Years

Get Free Design & Quote

Our engineers will respond within 24 hours
Inquiry Form Portfolio
Contact Via Whatsapp

Related Projects

Request a
Project Quote

Share your tensile architecture requirements with us. Our engineering specialists will review your project and provide a tailored preliminary solution within 24 hours.

Tell us about your project

Inquiry Form Pop Up

100% Secure & Confidential

×
Support
Support Team
               

Hello! 👋 How can we help you today?

WhatsApp
Call Us Now
Email Support
WhatsApp Call Inquiry Email