مظلة ممر جامعي لمشروع حرم جامعة قوانغشي مينزو
Located over a lakeside bridge in Nanning, this curved steel and PVDF structure enhances university campus circulation. The University Walkway Canopy protects a 366㎡ path while providing structural stability and optimized drainage.
الموقع
ناننينغ، الصين
المساحة (م²)
366㎡
سرعة الرياح
سرعة الرياح 120 كم/ساعة
تاريخ الإنجاز
12/2022
نظرة عامة على المشروع
This project is located at Guangxi Minzu University in Nanning, Guangxi, China, and was completed in December 2022. It is a pedestrian walkway tensile membrane canopy installed on an existing bridge along a lakeside area. The canopy measures approximately 60 m × 6 m with a central height of about 3 m, covering a total projected area of around 360 sqm. The steel structure consumes approximately 7 tons of steel.
The steel framework is protected with an epoxy zinc-rich primer and a yellow topcoat, providing enhanced durability and corrosion resistance. The roofing material is a white PVDF architectural membrane with a weight of 1100 g/sqm and a B1 fire rating, fully compliant with safety standards for public buildings.
التحدي - الحل
The pedestrian walkway serves as a key passage connecting teaching buildings and student dormitories and is located beside a lake. To improve daily circulation comfort and provide sun and rain protection, the university decided to install a canopy along the walkway.
The client specified clear requirements:
A functional canopy with a modern architectural appearance
Structural integration with the existing bridge and surrounding environment
Compliance with wind load safety standards
During the design phase, our team held multiple technical discussions with the client. Based on site conditions and functional needs, a tensile membrane structure composed of curved steel tubes was proposed. While ensuring practical performance, the design highlights the artistic flexibility of curved membrane structures. Comprehensive structural analysis and safety calculations were conducted, and the final design was approved after verification.
التركيب - الدعم
Installation was carried out by our engineering team on site. Due to the lakeside bridge location, access for large machinery was limited, so a scissor lift was used for sectional assembly and welding. During construction, pedestrian traffic was temporarily diverted to ensure safety.
With professional on-site installation and coordination, the project was successfully completed and delivered on schedule. The canopy not only improves pedestrian comfort but also enhances the campus landscape. The client highly recognized our integrated service covering design, fabrication, and on-site technical support.
| المواصفات | ||
|---|---|---|
| نوع القماش | PVDF | |
| نوع الإطار | هيكل الإطار | |
| حمل التصميم | سرعة الرياح 120 كم/ساعة | |
| عمر التصميم | 25-30 سنة | |
| الضمان | 10 سنوات | |
مشاريع ذات صلة
تُعزز سلامة المشاة في هاينان بواسطة هذا التركيب المنحني من PVDF على عارضة I يغطي 320 مترًا مربعًا. تتحمل مظلة التظليل من PVDF لممر المدرسة رياحًا شديدة تصل إلى 210 كم/ساعة لضمان قابلية استخدام الطلاب في الهواء الطلق على المدى الطويل.
يغطي هذا التركيب المستوحى من السحب والمحاكي للطبيعة من PVDF مساحة 1630 مترًا مربعًا من حركة مرور الطلاب الكثيفة في تشوهاي. صُمم لتحمل رياح تصل إلى 180 كم/ساعة، وتوفر مظلة ممر المدرسة حماية أساسية من الأشعة فوق البنفسجية وسلامة موثوقة للمشاة.
Situated on a Guangzhou hospital rooftop, this central single-column PVDF installation protects a 576㎡ leisure zone. The Fabric Roof System withstands coastal winds while providing functional lightweight shading for patients and staff.
This wave-shaped steel frame installation in Foshan utilizes fire-rated PVDF to enhance a 1286㎡ pedestrian corridor. The school pedestrian corridor canopy improves outdoor comfort for students through engineered shading and circulation.

