Xianglu Grand Hotel Restaurant Canopy Project

Designed an elegant three-peak PVDF dining canopy for Xianglu Hotel. We used deep prefabrication to guarantee a zero-interference installation.

Localização

Xiamen

Cobertura (M²)

386㎡

Velocidade do Vento

120 km/h

Data de Conclusão

06/2020

Realidade do Projeto

Galeria de Fotos da Estrutura Concluída
Fotos do Caso

Visão Geral do Projeto

Project Location: Xianglu Grand Hotel, Xiamen Completion Date: June 2020 Building Type: Three-Peak Tensile Membrane Canopy Project Background: To further elevate the outdoor dining experience for guests, the Xianglu Grand Hotel planned to add weather-proof sheltering to its internal second-floor open-air terrace. Covering a total area of 386 square meters, the canopy was designed as an elegant three-peak tensile membrane structure with varying heights. The goal was to create an all-weather outdoor space for the high-end restaurant that perfectly balances functionality and artistic aesthetics.

Visualização do Desenho

Visualizando antes da fabricação
Design & Renderizações

Desafio - Solução

Challenge 1: Zero-Interference Construction (Strict Noise & Time Control) The primary difficulty of this project was that the hotel remained fully operational during construction. The client explicitly required that on-site work must not disturb guests’ rest or the restaurant’s daily operations. This imposed extremely high requirements on construction time windows and noise control. Jutent Solution: Deep Factory Prefabrication To minimize on-site interference, our engineering team significantly increased the prefabrication rate. All steel structural frameworks underwent deep pre-processing, polishing, and anti-corrosion coating within Jutent’s dedicated factory. Once the components arrived at the site, only low-noise bolting and modular assembly were required. This approach completely avoided the noise and environmental pollution caused by large-scale on-site cutting and welding. Challenge 2: Finished Product Protection & Restricted Second-Floor Workspace The construction zone was located on an internal second-floor terrace. The surrounding finely finished flooring, glass railings, and supporting facilities were already completed; any collision would cause financial damage. Moreover, the logistics access and working area on the second-floor terrace were relatively restricted. Jutent Solution: Meticulous Site Protection & Agile Installation Before materials entered the site, the Jutent installation team implemented comprehensive physical isolation and soft padding protection for the existing floors and surrounding railings on the terrace. During the lifting and assembly processes, we utilized precision compact machinery coordinated with agile manual labor, safely and efficiently completing the complex structural erection within the confined workspace.

Execução no Local

Fases de Fabricação & Instalação
Processo de Construção

Instalação - Suporte

High-End Commercial Material Selection: The core canopy covering utilized a premium 1050g/㎡ PVDF architectural membrane. This material not only possesses excellent tear strength, self-cleaning properties, and weather resistance, but its unique light transmission and diffuse reflection characteristics also filter harsh sunlight during the day. At night, it interacts beautifully with lighting to create a warm, romantic dining atmosphere. Senior Engineer On-Site Management: Facing a stringent construction environment and a tight schedule, Jutent dispatched senior installation engineers for full-process on-site management. From staggered material delivery and the implementation of site protection to the final high-altitude tensioning of the three-peak membrane, we provided meticulous technical guidance and schedule control. This ensured the project was flawlessly delivered and commissioned in June 2020.
Especificação
Tipo de Tecido PVDF
Tipo de Estrutura Estrutura de Pórtico
Carga de Projeto 120 km/h
Vida Útil de Projeto 25-30 Anos
Garantia 10 Anos

Obter Design e Orçamento Grátis

Nossos engenheiros responderão em até 24 horas
Portfólio do Formulário de Consulta
Contato via Whatsapp

Projetos Relacionados

Localizada em um destino de lazer em Guizhou, esta instalação de PVDF de pico conectado oferece resistência robusta às intempéries em seus 1264㎡. A Estrutura de Sombreamento do Resort integra uma treliça estável e drenagem eficiente.
As instalações recreativas públicas em Taiwan se beneficiam desta instalação de 783㎡ com estrutura de aço curva. A estrutura de sombreamento tênsil para playground utiliza tecido PVDF de 1100 g/m² para fornecer proteção climática de longo prazo e econômica para brinquedos.
Dentro do parque do Lago Folk Song em Nanning, esta instalação de PVDF em cúpula circular protege 1120㎡ de espaço comercial público. A estrutura de sombreamento da praça comercial melhora a eficiência do sombreamento urbano e fortalece a identidade arquitetônica local.
Situada em Tel Aviv, esta instalação em estilo de cúpula com estrutura utiliza PVDF de 1100 g/m² com resistência ao fogo para proteger uma área de 378 m². A Cobertura de Membrana para Igreja oferece resistência robusta às intempéries e desempenho de longo prazo para edifícios religiosos institucionais.
Solicite um
Orçamento de Projeto

Compartilhe seus requisitos de arquitetura tênsil conosco. Nossos especialistas em engenharia revisarão seu projeto e fornecerão uma solução preliminar personalizada em até 24 horas.

Conte-nos sobre seu projeto

Formulário de Consulta Pop Up

100% Seguro & Confidencial

×
Suporte
Equipe de Suporte
               

Olá! 👋 Como podemos ajudá-lo hoje?

WhatsApp
Ligue Agora
Suporte por E-mail
WhatsApp Ligar Consulta E-mail