Liandong Middle School Wavy Rostrum Canopy Project
Liandong Middle School wavy rostrum canopy: utilized dual-crane integral lifting and PVDF fabric to guarantee a fast, zero-noise campus installation.
Localização
Wenchang City, China
Cobertura (M²)
224㎡
Velocidade do Vento
120 km/h
Data de Conclusão
07/2021
Visão Geral do Projeto
Project Location: Liandong Middle School, Wenchang City
Coverage Area: 224 square meters
Completion Date: July 2021
Building Type: Wavy Tensile Membrane Canopy
Project Background: Situated adjacent to the school’s sports field, this project primarily serves as the canopy for the rostrum. The overall design features an elegant wavy appearance, providing teachers and students with essential shade and rain protection while significantly enhancing the visual appeal of the entire sports facility.
Visualização do Desenho
Visualizando antes da fabricação
Design & Renderizações
Desafio - Solução
Challenge: High Elevation, Tight Schedule & Campus Construction Limits
Due to the relatively high design elevation of the canopy and a tight delivery schedule, the construction team faced considerable pressure. Furthermore, because the site was located within the campus, the school administration imposed strict limitations on construction hours and noise levels. Traditional high-altitude scaffold assembly could not meet these rigid requirements.
Jutent Solution: Ground Pre-Assembly & Dual-Crane Integral Lifting
To ensure low-noise and high-efficiency execution within the specified timeframe, we adopted an “integral lifting” installation strategy. The engineering team first completely assembled the wavy steel framework on the ground. Once pre-assembly was finished, two cranes were deployed to synchronously hoist and position the entire structure in a single operation. This solution perfectly bypassed the noise and safety hazards associated with prolonged high-altitude construction.
Instalação - Suporte
Premium Materials & Efficient Delivery: The canopy utilized a 1050g/㎡ PVDF architectural membrane, renowned for its outstanding weather resistance and self-cleaning capabilities. During the critical construction phases, Jutent dispatched dedicated installation engineers to provide full-process on-site guidance. Thanks to the highly coordinated integral lifting plan, we firmly guaranteed the construction schedule, successfully completing and delivering a high-quality facility to the client.
| Especificação | ||
|---|---|---|
| Tipo de Tecido | PVDF | |
| Tipo de Estrutura | Estrutura de Treliça | |
| Carga de Projeto | 120 km/h | |
| Vida Útil de Projeto | 25-30 Anos | |
| Garantia | 10 Anos | |
Obter Design e Orçamento Grátis
Nossos engenheiros responderão em até 24 horas
Contato via Whatsapp
Projetos Relacionados
Esta instalação de PVDF de pico duplo curva em Dongguan suporta ventos de 160 km/h enquanto cobre um palco de parque de 286㎡. O sistema de cobertura de palco oferece estética aprimorada e proteção durável para o telhado do anfiteatro para os visitantes.
Projetada para otimizar a difusão da luz natural, esta instalação de treliça com tirantes cobre 2968 m² de uma instalação esportiva em Guangzhou. A cobertura da arquibancada do estádio utiliza material PTFE de 1300 g/m² para garantir proteção de longo vão para espectadores esportivos.
Apresentações em parques públicos ao ar livre na Flórida são protegidas por esta instalação de treliça de aço curva de 830 m². O telhado do anfiteatro utiliza material PTFE de alto padrão de 1300 g/m² para fornecer proteção permanente contra sol e chuva.
Esta instalação tripla de PVDF em arco em Heyuan fornece 184㎡ de proteção essencial contra intempéries para arquibancadas de campus. O sistema de cobertura de estádio é projetado para cobertura de palco tensionada e uso de longo prazo em instalações escolares.