Xianglu Grand Hotel Restaurant Canopy Project

Designed an elegant three-peak PVDF dining canopy for Xianglu Hotel. We used deep prefabrication to guarantee a zero-interference installation.

Vị trí

Xiamen

Diện tích che phủ (M²)

386㎡

Tốc độ gió

120 km/h

Ngày hoàn thành

06/2020

Thực tế dự án

Thư viện ảnh công trình đã hoàn thiện
Ảnh dự án

Tổng quan dự án

Project Location: Xianglu Grand Hotel, Xiamen Completion Date: June 2020 Building Type: Three-Peak Tensile Membrane Canopy Project Background: To further elevate the outdoor dining experience for guests, the Xianglu Grand Hotel planned to add weather-proof sheltering to its internal second-floor open-air terrace. Covering a total area of 386 square meters, the canopy was designed as an elegant three-peak tensile membrane structure with varying heights. The goal was to create an all-weather outdoor space for the high-end restaurant that perfectly balances functionality and artistic aesthetics.

Hình ảnh trực quan bản vẽ

Trực quan hóa trước khi chế tạo
Thiết kế & Hình ảnh dựng

Thách thức - Giải pháp

Challenge 1: Zero-Interference Construction (Strict Noise & Time Control) The primary difficulty of this project was that the hotel remained fully operational during construction. The client explicitly required that on-site work must not disturb guests’ rest or the restaurant’s daily operations. This imposed extremely high requirements on construction time windows and noise control. Jutent Solution: Deep Factory Prefabrication To minimize on-site interference, our engineering team significantly increased the prefabrication rate. All steel structural frameworks underwent deep pre-processing, polishing, and anti-corrosion coating within Jutent’s dedicated factory. Once the components arrived at the site, only low-noise bolting and modular assembly were required. This approach completely avoided the noise and environmental pollution caused by large-scale on-site cutting and welding. Challenge 2: Finished Product Protection & Restricted Second-Floor Workspace The construction zone was located on an internal second-floor terrace. The surrounding finely finished flooring, glass railings, and supporting facilities were already completed; any collision would cause financial damage. Moreover, the logistics access and working area on the second-floor terrace were relatively restricted. Jutent Solution: Meticulous Site Protection & Agile Installation Before materials entered the site, the Jutent installation team implemented comprehensive physical isolation and soft padding protection for the existing floors and surrounding railings on the terrace. During the lifting and assembly processes, we utilized precision compact machinery coordinated with agile manual labor, safely and efficiently completing the complex structural erection within the confined workspace.

Thi công tại công trường

Giai đoạn Chế tạo & Lắp đặt
Quy trình xây dựng

Lắp đặt - Hỗ trợ

High-End Commercial Material Selection: The core canopy covering utilized a premium 1050g/㎡ PVDF architectural membrane. This material not only possesses excellent tear strength, self-cleaning properties, and weather resistance, but its unique light transmission and diffuse reflection characteristics also filter harsh sunlight during the day. At night, it interacts beautifully with lighting to create a warm, romantic dining atmosphere. Senior Engineer On-Site Management: Facing a stringent construction environment and a tight schedule, Jutent dispatched senior installation engineers for full-process on-site management. From staggered material delivery and the implementation of site protection to the final high-altitude tensioning of the three-peak membrane, we provided meticulous technical guidance and schedule control. This ensured the project was flawlessly delivered and commissioned in June 2020.
Thông số kỹ thuật
Loại vải PVDF
Loại khung Kết cấu khung
Tải trọng thiết kế 120 km/h
Tuổi thọ thiết kế 25-30 Năm
Bảo hành 10 Năm

Nhận Thiết kế & Báo giá Miễn phí

Kỹ sư của chúng tôi sẽ phản hồi trong vòng 24 giờ
Danh mục mẫu yêu cầu
Liên hệ qua Whatsapp

Dự án liên quan

Tọa lạc tại một điểm đến nghỉ dưỡng ở Quý Châu, công trình PVDF đỉnh liền kề này mang đến khả năng chống chịu thời tiết mạnh mẽ trên diện tích 1264㎡. Cấu trúc che nắng cho Khu nghỉ dưỡng tích hợp khung giàn ổn định và hệ thống thoát nước hiệu quả.
Các cơ sở giải trí công cộng tại Đài Loan được hưởng lợi từ công trình khung thép cong rộng 783㎡ này. Kết cấu che nắng căng cho sân chơi sử dụng vải PVDF 1100 g/m² để mang lại khả năng bảo vệ thời tiết lâu dài, tiết kiệm chi phí cho các trò chơi giải trí.
Trong khuôn viên công viên Hồ Dân ca Nam Ninh, công trình mái vòm tròn bằng PVDF này bảo vệ 1120m² không gian bán lẻ công cộng. Mái che quảng trường thương mại giúp cải thiện hiệu quả che chắn đô thị và củng cố bản sắc kiến trúc địa phương.
Tọa lạc tại Tel Aviv, công trình mái vòm kiểu khung này sử dụng màng PVDF chống cháy 1100 g/m² để bảo vệ diện tích 378㎡. Kết cấu mái che Nhà thờ mang lại khả năng chống chịu thời tiết mạnh mẽ và hiệu suất lâu dài cho các công trình tôn giáo thể chế.
Yêu cầu
Báo giá dự án

Chia sẻ yêu cầu về kiến trúc tensile của bạn với chúng tôi. Các chuyên gia kỹ thuật của chúng tôi sẽ xem xét dự án của bạn và cung cấp giải pháp sơ bộ phù hợp trong vòng 24 giờ.

Hãy cho chúng tôi biết về dự án của bạn

Biểu mẫu yêu cầu bật lên

100% Bảo mật & An toàn

×
Hỗ trợ
Đội Ngũ Hỗ Trợ
               

Xin chào! 👋 Chúng tôi có thể giúp gì cho bạn hôm nay?

WhatsApp
Gọi Cho Chúng Tôi Ngay
Hỗ Trợ Qua Email
WhatsApp Gọi Yêu Cầu Báo Giá Email