Xianglu Grand Hotel Restaurant Canopy Project
Designed an elegant three-peak PVDF dining canopy for Xianglu Hotel. We used deep prefabrication to guarantee a zero-interference installation.
Vị trí
Xiamen
Diện tích che phủ (M²)
386㎡
Tốc độ gió
120 km/h
Ngày hoàn thành
06/2020
Tổng quan dự án
Project Location: Xianglu Grand Hotel, Xiamen
Completion Date: June 2020
Building Type: Three-Peak Tensile Membrane Canopy
Project Background: To further elevate the outdoor dining experience for guests, the Xianglu Grand Hotel planned to add weather-proof sheltering to its internal second-floor open-air terrace. Covering a total area of 386 square meters, the canopy was designed as an elegant three-peak tensile membrane structure with varying heights. The goal was to create an all-weather outdoor space for the high-end restaurant that perfectly balances functionality and artistic aesthetics.
Hình ảnh trực quan bản vẽ
Trực quan hóa trước khi chế tạo
Thiết kế & Hình ảnh dựng
Thách thức - Giải pháp
Challenge 1: Zero-Interference Construction (Strict Noise & Time Control)
The primary difficulty of this project was that the hotel remained fully operational during construction. The client explicitly required that on-site work must not disturb guests’ rest or the restaurant’s daily operations. This imposed extremely high requirements on construction time windows and noise control.
Jutent Solution: Deep Factory Prefabrication
To minimize on-site interference, our engineering team significantly increased the prefabrication rate. All steel structural frameworks underwent deep pre-processing, polishing, and anti-corrosion coating within Jutent’s dedicated factory. Once the components arrived at the site, only low-noise bolting and modular assembly were required. This approach completely avoided the noise and environmental pollution caused by large-scale on-site cutting and welding.
Challenge 2: Finished Product Protection & Restricted Second-Floor Workspace
The construction zone was located on an internal second-floor terrace. The surrounding finely finished flooring, glass railings, and supporting facilities were already completed; any collision would cause financial damage. Moreover, the logistics access and working area on the second-floor terrace were relatively restricted.
Jutent Solution: Meticulous Site Protection & Agile Installation
Before materials entered the site, the Jutent installation team implemented comprehensive physical isolation and soft padding protection for the existing floors and surrounding railings on the terrace. During the lifting and assembly processes, we utilized precision compact machinery coordinated with agile manual labor, safely and efficiently completing the complex structural erection within the confined workspace.
Lắp đặt - Hỗ trợ
High-End Commercial Material Selection: The core canopy covering utilized a premium 1050g/㎡ PVDF architectural membrane. This material not only possesses excellent tear strength, self-cleaning properties, and weather resistance, but its unique light transmission and diffuse reflection characteristics also filter harsh sunlight during the day. At night, it interacts beautifully with lighting to create a warm, romantic dining atmosphere.
Senior Engineer On-Site Management: Facing a stringent construction environment and a tight schedule, Jutent dispatched senior installation engineers for full-process on-site management. From staggered material delivery and the implementation of site protection to the final high-altitude tensioning of the three-peak membrane, we provided meticulous technical guidance and schedule control. This ensured the project was flawlessly delivered and commissioned in June 2020.
| Thông số kỹ thuật | ||
|---|---|---|
| Loại vải | PVDF | |
| Loại khung | Kết cấu khung | |
| Tải trọng thiết kế | 120 km/h | |
| Tuổi thọ thiết kế | 25-30 Năm | |
| Bảo hành | 10 Năm | |
Nhận Thiết kế & Báo giá Miễn phí
Kỹ sư của chúng tôi sẽ phản hồi trong vòng 24 giờ
Liên hệ qua Whatsapp
Dự án liên quan
Tọa lạc tại một điểm đến nghỉ dưỡng ở Quý Châu, công trình PVDF đỉnh liền kề này mang đến khả năng chống chịu thời tiết mạnh mẽ trên diện tích 1264㎡. Cấu trúc che nắng cho Khu nghỉ dưỡng tích hợp khung giàn ổn định và hệ thống thoát nước hiệu quả.
Các cơ sở giải trí công cộng tại Đài Loan được hưởng lợi từ công trình khung thép cong rộng 783㎡ này. Kết cấu che nắng căng cho sân chơi sử dụng vải PVDF 1100 g/m² để mang lại khả năng bảo vệ thời tiết lâu dài, tiết kiệm chi phí cho các trò chơi giải trí.
Trong khuôn viên công viên Hồ Dân ca Nam Ninh, công trình mái vòm tròn bằng PVDF này bảo vệ 1120m² không gian bán lẻ công cộng. Mái che quảng trường thương mại giúp cải thiện hiệu quả che chắn đô thị và củng cố bản sắc kiến trúc địa phương.
Tọa lạc tại Tel Aviv, công trình mái vòm kiểu khung này sử dụng màng PVDF chống cháy 1100 g/m² để bảo vệ diện tích 378㎡. Kết cấu mái che Nhà thờ mang lại khả năng chống chịu thời tiết mạnh mẽ và hiệu suất lâu dài cho các công trình tôn giáo thể chế.