Heesung Electronics Loading Area Canopy

Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.

Ubicación

Guangzhou, China

Cobertura (M²)

1250㎡

Velocidad del Viento

120 km/h

Fecha de Finalización

04/2020

Realidad del Proyecto

Galería de Fotos de la Estructura Terminada
Fotos del Caso

Resumen del Proyecto

Project Location: Heesung Electronics Factory, Guangzhou Coverage Area: 1250 square meters Completion Year: 2020 Building Type: Curved Tensile Membrane Corridor Canopy Project Background: As a large-scale electronics manufacturing enterprise, the factory has a massive logistics throughput. To ensure that goods are protected from heavy rain and scorching sun during loading and unloading, and to guarantee all-weather efficient logistics operations, the client urgently needed to construct a large-area sunshade and rain-proof canopy at the loading area in front of the factory building.

Visualización de Dibujos

Visualización antes de la fabricación
Diseño y Renderizados

Desafío - Solución

Challenge 1: Restricted Workspace & Ultra-Large-Scale Lifting The on-site space in the factory’s loading area was narrow and adjacent to buildings already in use. The traditional full-scaffold, high-altitude piecemeal assembly method would not only be highly inefficient but also severely disrupt the factory’s daily operations. Jutent Solution: Segmented Ground Pre-Assembly & Integral Lifting Faced with a massive 1250-square-meter structure, our engineering team developed a scientific modularization strategy. We logically divided the entire steel structural framework into three independent modules, completing high-precision pre-assembly in an open area on the ground. Subsequently, using heavy lifting equipment, these three major modules were hoisted and positioned individually. This solution perfectly overcame the site constraints, drastically reduced high-risk aerial work, and significantly boosted installation efficiency. Challenge 2: Waterproofing & Drainage at the New/Old Building Junction One side of the corridor canopy was closely attached to the exterior wall of the existing factory building. Guangzhou experiences abundant rainfall in the summer; improper drainage design could easily lead to rainwater backflow or water accumulation eroding the original building. Jutent Solution: Customized Wall-Mounted Gutter Drainage System During the structural design phase, Jutent engineers conducted in-depth node detailing specifically for the wall-adjacent edge. We customized and installed a dedicated drainage gutter that perfectly integrated with the membrane structure. Through precise slope calculations, we ensured that the rainwater collected by the canopy could be swiftly and systematically channeled into the underground drainage network, completely eliminating waterproofing risks at the wall junction of the large-span membrane structure.

Ejecución en obra

Fases de fabricación e instalación
Proceso de construcción

Instalación - Soporte

Industrial-Grade Weather-Resistant Membrane: The canopy utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. This material boasts exceptional tear strength and self-cleaning properties, enabling it to resist dust settlement in industrial environments over the long term while providing outstanding sunshade and thermal insulation for the loading area. Precision Factory Fabrication & On-Site Installation: All core steel components underwent pre-fabrication and anti-corrosion coating within the Jutent factory. During the intense lifting and tensioning phases, Jutent dispatched senior installation engineers for full-process on-site supervision. They strictly controlled and supervised the technical and safety aspects of every stress node and membrane tensioning step, ensuring the high-quality delivery and commissioning of the project in 2020.
Especificación
Tipo de Tela PVDF
Tipo de Estructura Estructura de Armadura
Carga de diseño 120 km/h
Vida útil de diseño 25-30 años
Garantía 10 años

Obtén Diseño y Cotización Gratis

Nuestros ingenieros responderán en un plazo de 24 horas
Formulario de Consulta de Portafolio
Contáctanos por WhatsApp

Proyectos Relacionados

Las operaciones de carga industrial en Hanói se optimizan con esta instalación de PVDF de picos conectados que cubre 630㎡. El toldo de alero de tela garantiza un drenaje eficiente del agua de lluvia y una protección duradera para las zonas de camiones de carga pesada.
Solicitar un
Presupuesto de proyecto

Comparta sus requisitos de arquitectura tensada con nosotros. Nuestros especialistas en ingeniería revisarán su proyecto y le proporcionarán una solución preliminar personalizada en un plazo de 24 horas.

Cuéntenos sobre su proyecto

Ventana emergente del formulario de consulta

100% Seguro & Confidencial

×
Soporte
Equipo de soporte
               

¡Hola! 👋 ¿Cómo podemos ayudarte hoy?

WhatsApp
Llámenos ahora
Soporte por correo electrónico
WhatsApp Llamar Consulta Correo electrónico