Heesung Electronics Loading Area Canopy

Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.

Vị trí

Quảng Châu, Trung Quốc

Diện tích che phủ (M²)

1250㎡

Tốc độ gió

120 km/h

Ngày hoàn thành

04/2020

Thực tế dự án

Thư viện ảnh công trình đã hoàn thiện
Ảnh dự án

Tổng quan dự án

Project Location: Heesung Electronics Factory, Guangzhou Coverage Area: 1250 square meters Completion Year: 2020 Building Type: Curved Tensile Membrane Corridor Canopy Project Background: As a large-scale electronics manufacturing enterprise, the factory has a massive logistics throughput. To ensure that goods are protected from heavy rain and scorching sun during loading and unloading, and to guarantee all-weather efficient logistics operations, the client urgently needed to construct a large-area sunshade and rain-proof canopy at the loading area in front of the factory building.

Hình ảnh trực quan bản vẽ

Trực quan hóa trước khi chế tạo
Thiết kế & Hình ảnh dựng

Thách thức - Giải pháp

Challenge 1: Restricted Workspace & Ultra-Large-Scale Lifting The on-site space in the factory’s loading area was narrow and adjacent to buildings already in use. The traditional full-scaffold, high-altitude piecemeal assembly method would not only be highly inefficient but also severely disrupt the factory’s daily operations. Jutent Solution: Segmented Ground Pre-Assembly & Integral Lifting Faced with a massive 1250-square-meter structure, our engineering team developed a scientific modularization strategy. We logically divided the entire steel structural framework into three independent modules, completing high-precision pre-assembly in an open area on the ground. Subsequently, using heavy lifting equipment, these three major modules were hoisted and positioned individually. This solution perfectly overcame the site constraints, drastically reduced high-risk aerial work, and significantly boosted installation efficiency. Challenge 2: Waterproofing & Drainage at the New/Old Building Junction One side of the corridor canopy was closely attached to the exterior wall of the existing factory building. Guangzhou experiences abundant rainfall in the summer; improper drainage design could easily lead to rainwater backflow or water accumulation eroding the original building. Jutent Solution: Customized Wall-Mounted Gutter Drainage System During the structural design phase, Jutent engineers conducted in-depth node detailing specifically for the wall-adjacent edge. We customized and installed a dedicated drainage gutter that perfectly integrated with the membrane structure. Through precise slope calculations, we ensured that the rainwater collected by the canopy could be swiftly and systematically channeled into the underground drainage network, completely eliminating waterproofing risks at the wall junction of the large-span membrane structure.

Thi công tại công trường

Giai đoạn Chế tạo & Lắp đặt
Quy trình xây dựng

Lắp đặt - Hỗ trợ

Industrial-Grade Weather-Resistant Membrane: The canopy utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. This material boasts exceptional tear strength and self-cleaning properties, enabling it to resist dust settlement in industrial environments over the long term while providing outstanding sunshade and thermal insulation for the loading area. Precision Factory Fabrication & On-Site Installation: All core steel components underwent pre-fabrication and anti-corrosion coating within the Jutent factory. During the intense lifting and tensioning phases, Jutent dispatched senior installation engineers for full-process on-site supervision. They strictly controlled and supervised the technical and safety aspects of every stress node and membrane tensioning step, ensuring the high-quality delivery and commissioning of the project in 2020.
Thông số kỹ thuật
Loại vải PVDF
Loại khung Kết cấu Giàn
Tải trọng thiết kế 120 km/h
Tuổi thọ thiết kế 25-30 Năm
Bảo hành 10 Năm

Nhận Thiết kế & Báo giá Miễn phí

Kỹ sư của chúng tôi sẽ phản hồi trong vòng 24 giờ
Danh mục mẫu yêu cầu
Liên hệ qua Whatsapp

Dự án liên quan

Hoạt động bốc xếp công nghiệp tại Hà Nội được tối ưu hóa nhờ hệ thống mái che PVDF kết nối đỉnh này, bao phủ 630㎡. Mái che vải dạng mái hiên đảm bảo thoát nước mưa hiệu quả và bảo vệ bền bỉ cho các khu vực xe tải hạng nặng.
Yêu cầu
Báo giá dự án

Chia sẻ yêu cầu về kiến trúc tensile của bạn với chúng tôi. Các chuyên gia kỹ thuật của chúng tôi sẽ xem xét dự án của bạn và cung cấp giải pháp sơ bộ phù hợp trong vòng 24 giờ.

Hãy cho chúng tôi biết về dự án của bạn

Biểu mẫu yêu cầu bật lên

100% Bảo mật & An toàn

×
Hỗ trợ
Đội Ngũ Hỗ Trợ
               

Xin chào! 👋 Chúng tôi có thể giúp gì cho bạn hôm nay?

WhatsApp
Gọi Cho Chúng Tôi Ngay
Hỗ Trợ Qua Email
WhatsApp Gọi Yêu Cầu Báo Giá Email