Huasheng Biological Loading Dock Canopy

Designed custom multi-node loading canopies for Huasheng Biological. Concurrent installation and heavy-duty PVDF ensure all-weather logistics protection.

Vị trí

Huệ Châu, Trung Quốc

Diện tích che phủ (M²)

460㎡

Tốc độ gió

120 km/h

Ngày hoàn thành

03/2026

Thực tế dự án

Thư viện ảnh công trình đã hoàn thiện
Ảnh dự án

Tổng quan dự án

Project Location: Huasheng Biological Factory, Huizhou Total Coverage Area: 460 square meters (Multiple combined units) Completion Date: March 2026 Building Type: Customized Tensile Membrane Loading Dock Canopy System Project Background: As a high-standard manufacturing enterprise, Huasheng Biological has strict requirements for the stability of its logistics supply chain. To prevent goods from being exposed to the sun and rain during loading and unloading, and to ensure the safety of biological products and efficient logistics, the client planned to build dedicated weather-proof canopies at the loading docks of several different factory buildings.

Hình ảnh trực quan bản vẽ

Trực quan hóa trước khi chế tạo
Thiết kế & Hình ảnh dựng

Thách thức - Giải pháp

Challenge 1: Scattered Multi-Node Layout & Highly Customized Needs Unlike conventional single-structure large canopies, this project consisted of multiple loading docks distributed across various factory buildings. Each dock featured different site environments, available spatial spans, and expected canopy shapes. This required the design solution to possess extreme flexibility and customization capabilities. Jutent Solution: Our engineering design team conducted precise on-site surveying for every loading node within the factory. Based on the actual facade environment of each building, we adopted a strategy of “unified design language with individual customization.” We performed independent structural form-finding and mechanical calculations for each loading dock. This approach ensured the structural safety of the differently shaped canopies while maintaining the architectural aesthetic consistency of the entire facility. Challenge 2: Concurrent Multi-Point Construction & High Demand for Team Collaboration The project required the simultaneous construction of multiple canopies without disrupting the normal production and logistics of the various workshops. This “multi-point concurrent” construction model posed a massive test to the installation team’s resource scheduling and on-site coordination capabilities. Jutent Solution: We developed a scientific “batched synchronous advancement” construction organization plan. By front-loading the complex coordination work, the engineering command center precisely allocated personnel, machinery, and materials. Various installation teams operated in parallel under unified directives, flawlessly achieving highly efficient cross-regional collaboration and ensuring the orderly, simultaneous progress of multiple individual canopy units.

Thi công tại công trường

Giai đoạn Chế tạo & Lắp đặt
Quy trình xây dựng

Lắp đặt - Hỗ trợ

High-Standard Industrial Material Selection: Considering the biological factory’s rigorous requirements for environmental cleanliness and facility durability, all canopies utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. Its outstanding self-cleaning properties and extremely high tensile strength provide long-lasting, maintenance-free, all-weather protection for the loading areas. Factory-Level Prefabrication & Seamless Installation: To minimize the footprint of on-site construction operations, all steel structural frameworks underwent high-precision prefabrication and anti-corrosion treatments at Jutent’s dedicated factory. During the on-site installation phase, Jutent dispatched highly experienced installation engineers for full-process on-site command. They strictly supervised the steel assembly and membrane tensioning processes at each node. All canopies were successfully delivered in March 2026, earning high praise from the client upon being put into use.
Thông số kỹ thuật
Loại vải PVDF
Loại khung Kết cấu khung
Tải trọng thiết kế 120 km/h
Tuổi thọ thiết kế 25-30 Năm
Bảo hành 10 Năm

Nhận Thiết kế & Báo giá Miễn phí

Kỹ sư của chúng tôi sẽ phản hồi trong vòng 24 giờ
Danh mục mẫu yêu cầu
Liên hệ qua Whatsapp

Dự án liên quan

Engineered 13 inverted tensile umbrellas for a Zhongshan rooftop. We overcame restricted space via step-by-step assembly and used heavy-duty PVDF.
Liandong Middle School wavy rostrum canopy: utilized dual-crane integral lifting and PVDF fabric to guarantee a fast, zero-noise campus installation.
Designed an elegant three-peak PVDF dining canopy for Xianglu Hotel. We used deep prefabrication to guarantee a zero-interference installation.
Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.
Yêu cầu
Báo giá dự án

Chia sẻ yêu cầu về kiến trúc tensile của bạn với chúng tôi. Các chuyên gia kỹ thuật của chúng tôi sẽ xem xét dự án của bạn và cung cấp giải pháp sơ bộ phù hợp trong vòng 24 giờ.

Hãy cho chúng tôi biết về dự án của bạn

Biểu mẫu yêu cầu bật lên

100% Bảo mật & An toàn

×
Hỗ trợ
Đội Ngũ Hỗ Trợ
               

Xin chào! 👋 Chúng tôi có thể giúp gì cho bạn hôm nay?

WhatsApp
Gọi Cho Chúng Tôi Ngay
Hỗ Trợ Qua Email
WhatsApp Gọi Yêu Cầu Báo Giá Email