Huasheng Biological Loading Dock Canopy

Designed custom multi-node loading canopies for Huasheng Biological. Concurrent installation and heavy-duty PVDF ensure all-weather logistics protection.

Emplacement

Huizhou, Chine

Couverture (M²)

460㎡

Vitesse du vent

120 km/h

Date complète

03/2026

Réalité du projet

Galerie photo de la structure achevée
Photos du projet

Aperçu du projet

Project Location: Huasheng Biological Factory, Huizhou Total Coverage Area: 460 square meters (Multiple combined units) Completion Date: March 2026 Building Type: Customized Tensile Membrane Loading Dock Canopy System Project Background: As a high-standard manufacturing enterprise, Huasheng Biological has strict requirements for the stability of its logistics supply chain. To prevent goods from being exposed to the sun and rain during loading and unloading, and to ensure the safety of biological products and efficient logistics, the client planned to build dedicated weather-proof canopies at the loading docks of several different factory buildings.

Visualisation du dessin

Visualisation avant fabrication
Design & Rendu

Défi - Solution

Challenge 1: Scattered Multi-Node Layout & Highly Customized Needs Unlike conventional single-structure large canopies, this project consisted of multiple loading docks distributed across various factory buildings. Each dock featured different site environments, available spatial spans, and expected canopy shapes. This required the design solution to possess extreme flexibility and customization capabilities. Jutent Solution: Our engineering design team conducted precise on-site surveying for every loading node within the factory. Based on the actual facade environment of each building, we adopted a strategy of “unified design language with individual customization.” We performed independent structural form-finding and mechanical calculations for each loading dock. This approach ensured the structural safety of the differently shaped canopies while maintaining the architectural aesthetic consistency of the entire facility. Challenge 2: Concurrent Multi-Point Construction & High Demand for Team Collaboration The project required the simultaneous construction of multiple canopies without disrupting the normal production and logistics of the various workshops. This “multi-point concurrent” construction model posed a massive test to the installation team’s resource scheduling and on-site coordination capabilities. Jutent Solution: We developed a scientific “batched synchronous advancement” construction organization plan. By front-loading the complex coordination work, the engineering command center precisely allocated personnel, machinery, and materials. Various installation teams operated in parallel under unified directives, flawlessly achieving highly efficient cross-regional collaboration and ensuring the orderly, simultaneous progress of multiple individual canopy units.

Exécution sur site

Fabrication & Installation phases
Processus de construction

Installation - Support

High-Standard Industrial Material Selection: Considering the biological factory’s rigorous requirements for environmental cleanliness and facility durability, all canopies utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. Its outstanding self-cleaning properties and extremely high tensile strength provide long-lasting, maintenance-free, all-weather protection for the loading areas. Factory-Level Prefabrication & Seamless Installation: To minimize the footprint of on-site construction operations, all steel structural frameworks underwent high-precision prefabrication and anti-corrosion treatments at Jutent’s dedicated factory. During the on-site installation phase, Jutent dispatched highly experienced installation engineers for full-process on-site command. They strictly supervised the steel assembly and membrane tensioning processes at each node. All canopies were successfully delivered in March 2026, earning high praise from the client upon being put into use.
Spécification
Fabric Type PVDF
Type de structure Structure à ossature
Charge de conception 120 km/h
Durée de vie de conception 25-30 ans
Garantie 10 ans

Obtenez une conception & un devis gratuits

Nos ingénieurs vous répondront sous 24 heures
Formulaire de demande Portfolio
Contacter via WhatsApp

Projets connexes

Engineered 13 inverted tensile umbrellas for a Zhongshan rooftop. We overcame restricted space via step-by-step assembly and used heavy-duty PVDF.
Liandong Middle School wavy rostrum canopy: utilized dual-crane integral lifting and PVDF fabric to guarantee a fast, zero-noise campus installation.
Designed an elegant three-peak PVDF dining canopy for Xianglu Hotel. We used deep prefabrication to guarantee a zero-interference installation.
Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.
Demandez un
Devis de projet

Partagez avec nous vos exigences en matière d'architecture tendue. Nos spécialistes en ingénierie examineront votre projet et vous fourniront une solution préliminaire sur mesure dans les 24 heures.

Parlez-nous de votre projet

Pop-up du formulaire de demande

100% Sécurisé & Confidentiel

×
Support
Équipe d'assistance
               

Bonjour ! 👋 Comment pouvons-nous vous aider aujourd'hui ?

WhatsApp
Appelez-nous maintenant
Assistance par e-mail
WhatsApp Appel Demande Email