GUANGZHOU International Air Cargo Terminal Parking Canopy

Delivered a 463㎡ tensile membrane parking canopy for the Guangzhou International Air Cargo Terminal. Engineered to high wind and snow resistance standards, we overcame complex concurrent construction to achieve efficient, early delivery.

الموقع

قوانغتشو، الصين

المساحة (م²)

463㎡

سرعة الرياح

160 km/h

تاريخ الإنجاز

07/2022

صورة واقعية للمشروع

معرض صور الهيكل المكتمل
صور الحالة

نظرة عامة على المشروع

Project Overview Project Location: Guangzhou International Air Cargo Terminal Coverage Area: 463 square meters Building Type: Large-Span Tensile Membrane Parking Shed Project Background: As a high-turnover international aviation logistics hub, the site urgently required an expanded sheltered space capable of accommodating large freight trucks for parking and dispatching. The project presented extremely stringent requirements for safety, construction efficiency, and space utilization.

تصور الرسم

التصور قبل التصنيع
التصميم والعروض

التحدي - الحل

Challenge 1: Stringent Load Requirements & Demand for Large-Span Column-Free Space The site demanded an obstruction-free interior to facilitate the smooth entry and exit of large freight vehicles. Simultaneously, due to local climate factors, the structure had to comply with exceptionally high safety standards for wind and snow load resistance. Jutent Solution: We utilized a combination of high-strength structural steel and premium architectural membranes, engineering a high wind-and-snow-resistant structural system through precise form-finding and mechanical calculations. After a thorough analysis of the site’s logistical flow, we innovatively optimized the overall stress model by purposefully adding structural columns to the rear row of the parking shed. This design perfectly adapted to the boundary limits without interfering with vehicle movement, while multiplying the overall structural stability of this 463㎡ large-span canopy. Challenge 2: Extremely Tight Schedule & Complex Concurrent Construction Conditions The project demanded delivery within an exceptionally short timeframe. More critically, the foundation construction of the tensile membrane parking shed had to proceed simultaneously with a concrete retaining wall project managed by another contractor. Jutent Solution: We implemented full-process interface coordination management. Our engineering team proactively front-loaded the coordination process, establishing a dynamic communication mechanism with the retaining wall contractor. By precisely delineating construction interfaces and working windows, we completely eliminated on-site scheduling conflicts.

التنفيذ في الموقع

مراحل التصنيع والتركيب
عملية البناء

التركيب - الدعم

Throughout the installation phase, Jutent demonstrated outstanding technical management and on-site execution: Modular Prefabrication & Assembly: To adapt to the restricted on-site working area, we adopted a strategy of “factory prefabrication + on-site modular assembly.” This significantly minimized on-site welding and cutting operations. Efficient Delivery: Backed by meticulous construction organization and on-site support from our professional technical team, we not only successfully overcame the complex environment of “building the wall and erecting the canopy simultaneously,” but ultimately completed the tensioning, anchoring, and delivery of all membrane materials 5 days ahead of schedule. The completed structure features smooth tension curves and maximized space utilization, winning high praise from the client.
المواصفات
نوع القماش PVDF
نوع الإطار هيكل الإطار
حمل التصميم 160 km/h
عمر التصميم 25-30 سنة
الضمان 10 سنوات

احصل على تصميم وعرض سعر مجاني

سيقوم مهندسونا بالرد خلال 24 ساعة
نموذج استفسار المحفظة
تواصل عبر واتساب

مشاريع ذات صلة

يقع هذا التركيب من PVDF على شكل حرف I بزاوية 7 درجات في منشأة شركة في هويتشو، ويضمن تخزينًا آمنًا للمركبات على مساحة 463 مترًا مربعًا. توفر مظلة مواقف السيارات المصنوعة من غشاء PVDF حلاً فعالاً من حيث التكلفة ومقاومًا للحريق للمواقع الصناعية.
يقع هذا التركيب متعدد المناطق من PVDF في منطقة صناعية في ديلي، ويحمي 2100 متر مربع من مواقف السيارات من العناصر الاستوائية. تستخدم مظلة مواقف السيارات التجارية هياكل ناتئة لتحمل رياحًا تصل سرعتها إلى 180 كم/ساعة وتوفير سلامة طويلة الأمد للمركبات.
يغطي هذا التركيب من PVDF ذو العارضة I المزدوجة الناتئة في شاوغوان 863 مترًا مربعًا من مواقف سيارات المستشفى. يتحمل هيكل مظلة محطة شحن السيارات الكهربائية رياحًا تصل سرعتها إلى 120 كم/ساعة لضمان حماية موثوقة للمركبات في المرافق الطبية.
يقع هذا التركيب من PVDF ذو العارضة I داخل منطقة صناعية في قوانغتشو، ويحمي منطقة مواقف سيارات بمساحة 1673 مترًا مربعًا من أشعة الشمس الشديدة. توفر مظلة السيارات الغشائية مقاومة موثوقة للأشعة فوق البنفسجية وتظليلًا دائمًا لتخزين المركبات التجارية.
طلب
عرض سعر المشروع

شاركنا متطلبات هيكلك الشددي. سيراجع خبراؤنا الهندسيون مشروعك ويقدمون حلاً أولياً مخصصاً خلال 24 ساعة.

أخبرنا عن مشروعك

نموذج الاستفسار المنبثق

100% آمن وسري

×
الدعم
فريق الدعم
               

مرحباً! 👋 كيف يمكننا مساعدتك اليوم؟

WhatsApp
اتصل بنا الآن
دعم البريد الإلكتروني
WhatsApp اتصال استفسار البريد الإلكتروني