GUANGZHOU International Air Cargo Terminal Parking Canopy

Delivered a 463㎡ tensile membrane parking canopy for the Guangzhou International Air Cargo Terminal. Engineered to high wind and snow resistance standards, we overcame complex concurrent construction to achieve efficient, early delivery.

Emplacement

Guangzhou, Chine

Couverture (M²)

463 ㎡

Vitesse du vent

160 km/h

Date complète

07/2022

Réalité du projet

Galerie photo de la structure achevée
Photos du projet

Aperçu du projet

Project Overview Project Location: Guangzhou International Air Cargo Terminal Coverage Area: 463 square meters Building Type: Large-Span Tensile Membrane Parking Shed Project Background: As a high-turnover international aviation logistics hub, the site urgently required an expanded sheltered space capable of accommodating large freight trucks for parking and dispatching. The project presented extremely stringent requirements for safety, construction efficiency, and space utilization.

Visualisation du dessin

Visualisation avant fabrication
Design & Rendu

Défi - Solution

Challenge 1: Stringent Load Requirements & Demand for Large-Span Column-Free Space The site demanded an obstruction-free interior to facilitate the smooth entry and exit of large freight vehicles. Simultaneously, due to local climate factors, the structure had to comply with exceptionally high safety standards for wind and snow load resistance. Jutent Solution: We utilized a combination of high-strength structural steel and premium architectural membranes, engineering a high wind-and-snow-resistant structural system through precise form-finding and mechanical calculations. After a thorough analysis of the site’s logistical flow, we innovatively optimized the overall stress model by purposefully adding structural columns to the rear row of the parking shed. This design perfectly adapted to the boundary limits without interfering with vehicle movement, while multiplying the overall structural stability of this 463㎡ large-span canopy. Challenge 2: Extremely Tight Schedule & Complex Concurrent Construction Conditions The project demanded delivery within an exceptionally short timeframe. More critically, the foundation construction of the tensile membrane parking shed had to proceed simultaneously with a concrete retaining wall project managed by another contractor. Jutent Solution: We implemented full-process interface coordination management. Our engineering team proactively front-loaded the coordination process, establishing a dynamic communication mechanism with the retaining wall contractor. By precisely delineating construction interfaces and working windows, we completely eliminated on-site scheduling conflicts.

Exécution sur site

Fabrication & Installation phases
Processus de construction

Installation - Support

Throughout the installation phase, Jutent demonstrated outstanding technical management and on-site execution: Modular Prefabrication & Assembly: To adapt to the restricted on-site working area, we adopted a strategy of “factory prefabrication + on-site modular assembly.” This significantly minimized on-site welding and cutting operations. Efficient Delivery: Backed by meticulous construction organization and on-site support from our professional technical team, we not only successfully overcame the complex environment of “building the wall and erecting the canopy simultaneously,” but ultimately completed the tensioning, anchoring, and delivery of all membrane materials 5 days ahead of schedule. The completed structure features smooth tension curves and maximized space utilization, winning high praise from the client.
Spécification
Fabric Type PVDF
Type de structure Structure à ossature
Charge de conception 160 km/h
Durée de vie de conception 25-30 ans
Garantie 10 ans

Obtenez une conception & un devis gratuits

Nos ingénieurs vous répondront sous 24 heures
Formulaire de demande Portfolio
Contacter via WhatsApp

Projets connexes

Située dans un complexe d'entreprise à Huizhou, cette installation PVDF en forme de 7 sur poutre en I assure un stockage sécurisé des véhicules sur 463 m². L'ombrière de stationnement en membrane PVDF offre une solution d'ombrage économique et ignifugée pour les sites industriels.
Situé dans un parc industriel de Dili, cette installation PVDF multizone protège 2100 m² de stationnement des éléments tropicaux. L'ombrière de parking commercial utilise des structures en porte-à-faux pour résister à des vents de 180 km/h et assurer une sécurité à long terme des véhicules.
Cette installation PVDF à double porte-à-faux en poutre I à Shaoguan couvre 863 m² de stationnement hospitalier. La structure d'ombrière pour borne de recharge de véhicules électriques résiste à des vents de 120 km/h pour garantir une protection fiable des véhicules dans les établissements médicaux.
Située dans un parc industriel de Guangzhou, cette installation PVDF en poutre I protège une zone de stationnement de 1673 m² du soleil intense. L'auvent de stationnement en membrane offre une résistance UV fiable et un ombrage durable pour le stockage commercial de véhicules.
Demandez un
Devis de projet

Partagez avec nous vos exigences en matière d'architecture tendue. Nos spécialistes en ingénierie examineront votre projet et vous fourniront une solution préliminaire sur mesure dans les 24 heures.

Parlez-nous de votre projet

Pop-up du formulaire de demande

100% Sécurisé & Confidentiel

×
Support
Équipe d'assistance
               

Bonjour ! 👋 Comment pouvons-nous vous aider aujourd'hui ?

WhatsApp
Appelez-nous maintenant
Assistance par e-mail
WhatsApp Appel Demande Email