GUANGZHOU International Air Cargo Terminal Parking Canopy

Delivered a 463㎡ tensile membrane parking canopy for the Guangzhou International Air Cargo Terminal. Engineered to high wind and snow resistance standards, we overcame complex concurrent construction to achieve efficient, early delivery.

Location

Guangzhou, China

Coverage(M²)

463㎡

Wind Speed

160 km/h

Complete Date

07/2022

Project Reality

Photo Gallery of the Completed Structure
Case Photos

Project Overview

Project Overview Project Location: Guangzhou International Air Cargo Terminal Coverage Area: 463 square meters Building Type: Large-Span Tensile Membrane Parking Shed Project Background: As a high-turnover international aviation logistics hub, the site urgently required an expanded sheltered space capable of accommodating large freight trucks for parking and dispatching. The project presented extremely stringent requirements for safety, construction efficiency, and space utilization.

Drawing Visualization

Visualizing before fabrication
Design & Renderings

Challenge - Solution

Challenge 1: Stringent Load Requirements & Demand for Large-Span Column-Free Space The site demanded an obstruction-free interior to facilitate the smooth entry and exit of large freight vehicles. Simultaneously, due to local climate factors, the structure had to comply with exceptionally high safety standards for wind and snow load resistance. Jutent Solution: We utilized a combination of high-strength structural steel and premium architectural membranes, engineering a high wind-and-snow-resistant structural system through precise form-finding and mechanical calculations. After a thorough analysis of the site’s logistical flow, we innovatively optimized the overall stress model by purposefully adding structural columns to the rear row of the parking shed. This design perfectly adapted to the boundary limits without interfering with vehicle movement, while multiplying the overall structural stability of this 463㎡ large-span canopy. Challenge 2: Extremely Tight Schedule & Complex Concurrent Construction Conditions The project demanded delivery within an exceptionally short timeframe. More critically, the foundation construction of the tensile membrane parking shed had to proceed simultaneously with a concrete retaining wall project managed by another contractor. Jutent Solution: We implemented full-process interface coordination management. Our engineering team proactively front-loaded the coordination process, establishing a dynamic communication mechanism with the retaining wall contractor. By precisely delineating construction interfaces and working windows, we completely eliminated on-site scheduling conflicts.

On-site Execution

Fabrication & Installation phases
Construction Process

Installation - Support

Throughout the installation phase, Jutent demonstrated outstanding technical management and on-site execution: Modular Prefabrication & Assembly: To adapt to the restricted on-site working area, we adopted a strategy of “factory prefabrication + on-site modular assembly.” This significantly minimized on-site welding and cutting operations. Efficient Delivery: Backed by meticulous construction organization and on-site support from our professional technical team, we not only successfully overcame the complex environment of “building the wall and erecting the canopy simultaneously,” but ultimately completed the tensioning, anchoring, and delivery of all membrane materials 5 days ahead of schedule. The completed structure features smooth tension curves and maximized space utilization, winning high praise from the client.
Specification
Fabric Type PVDF
Frame Type Frame Structure
Design Load 160 km/h
Design Life 25-30 Yrs
Warranty 10 Years

Get Free Design & Quote

Our engineers will respond within 24 hours
Inquiry Form Portfolio
Contact Via Whatsapp

Related Projects

Located at a Huizhou corporate facility, this 7-shaped I-beam PVDF installation ensures safe vehicle storage across 463㎡. The PVDF Membrane Parking Shade provides a cost-effective, fire-rated shading solution for industrial sites.
Located in a Dili industrial park, this multi-zone PVDF installation protects 2100㎡ of parking from tropical elements. The Commercial Parking Shade utilizes cantilevered structures to withstand 180 km/h winds and provide long-term vehicle safety.
This I-beam double-cantilever PVDF installation in Shaoguan covers 863㎡ of hospital parking. The EV Charging Station Shade Structure withstands 120 km/h winds to ensure reliable vehicle protection for medical facilities.
Located within a Guangzhou industrial park, this I-beam PVDF installation protects a 1673㎡ parking zone from intense sunlight. The Membrane Carport provides reliable UV resistance and durable shading for commercial vehicle storage.
Request a
Project Quote

Share your tensile architecture requirements with us. Our engineering specialists will review your project and provide a tailored preliminary solution within 24 hours.

Tell us about your project

Inquiry Form Pop Up

100% Secure & Confidential

×
Support
Support Team
               

Hello! 👋 How can we help you today?

WhatsApp
Call Us Now
Email Support
WhatsApp Call Inquiry Email