GUANGZHOU International Air Cargo Terminal Parking Canopy

Delivered a 463㎡ tensile membrane parking canopy for the Guangzhou International Air Cargo Terminal. Engineered to high wind and snow resistance standards, we overcame complex concurrent construction to achieve efficient, early delivery.

Lokasi

Guangzhou, China

Liputan (M²)

463㎡

Kelajuan Angin

160 km/h

Tarikh Siap

07/2022

Realiti Projek

Galeri Foto Struktur Siap
Gambar Kes

Gambaran Keseluruhan Projek

Project Overview Project Location: Guangzhou International Air Cargo Terminal Coverage Area: 463 square meters Building Type: Large-Span Tensile Membrane Parking Shed Project Background: As a high-turnover international aviation logistics hub, the site urgently required an expanded sheltered space capable of accommodating large freight trucks for parking and dispatching. The project presented extremely stringent requirements for safety, construction efficiency, and space utilization.

Visualisasi Lukisan

Visualisasi sebelum fabrikasi
Reka Bentuk & Render

Cabaran - Penyelesaian

Challenge 1: Stringent Load Requirements & Demand for Large-Span Column-Free Space The site demanded an obstruction-free interior to facilitate the smooth entry and exit of large freight vehicles. Simultaneously, due to local climate factors, the structure had to comply with exceptionally high safety standards for wind and snow load resistance. Jutent Solution: We utilized a combination of high-strength structural steel and premium architectural membranes, engineering a high wind-and-snow-resistant structural system through precise form-finding and mechanical calculations. After a thorough analysis of the site’s logistical flow, we innovatively optimized the overall stress model by purposefully adding structural columns to the rear row of the parking shed. This design perfectly adapted to the boundary limits without interfering with vehicle movement, while multiplying the overall structural stability of this 463㎡ large-span canopy. Challenge 2: Extremely Tight Schedule & Complex Concurrent Construction Conditions The project demanded delivery within an exceptionally short timeframe. More critically, the foundation construction of the tensile membrane parking shed had to proceed simultaneously with a concrete retaining wall project managed by another contractor. Jutent Solution: We implemented full-process interface coordination management. Our engineering team proactively front-loaded the coordination process, establishing a dynamic communication mechanism with the retaining wall contractor. By precisely delineating construction interfaces and working windows, we completely eliminated on-site scheduling conflicts.

Pelaksanaan di Tapak

Fasa Fabrikasi & Pemasangan
Proses Pembinaan

Pemasangan - Sokongan

Throughout the installation phase, Jutent demonstrated outstanding technical management and on-site execution: Modular Prefabrication & Assembly: To adapt to the restricted on-site working area, we adopted a strategy of “factory prefabrication + on-site modular assembly.” This significantly minimized on-site welding and cutting operations. Efficient Delivery: Backed by meticulous construction organization and on-site support from our professional technical team, we not only successfully overcame the complex environment of “building the wall and erecting the canopy simultaneously,” but ultimately completed the tensioning, anchoring, and delivery of all membrane materials 5 days ahead of schedule. The completed structure features smooth tension curves and maximized space utilization, winning high praise from the client.
Spesifikasi
Jenis Fabrik PVDF
Jenis Rangka Struktur Rangka
Beban Reka Bentuk 160 km/h
Hayat Reka Bentuk 25-30 Tahun
Jaminan 10 Tahun

Dapatkan Reka Bentuk & Sebut Harga Percuma

Jurutera kami akan membalas dalam masa 24 jam
Borang Pertanyaan Portfolio
Hubungi Melalui Whatsapp

Projek Berkaitan

Terletak di kemudahan korporat Huizhou, pemasangan PVDF rasuk-I berbentuk 7 ini memastikan penyimpanan kenderaan yang selamat merentasi 463㎡. Teduhan Tempat Letak Kereta PVDF menyediakan penyelesaian teduhan yang kos efektif dan tahan api untuk tapak perindustrian.
Terletak di taman perindustrian Dili, pemasangan PVDF pelbagai zon ini melindungi 2100㎡ tempat letak kereta daripada unsur tropika. Teduhan Tempat Letak Kereta Komersial ini menggunakan struktur julur untuk menahan angin 180 km/j dan memberikan keselamatan kenderaan jangka panjang.
Pemasangan PVDF julur berganda rasuk-I di Shaoguan ini meliputi 863㎡ tempat letak kereta hospital. Struktur Teduhan Stesen Pengecas EV ini menahan angin 120 km/j untuk memastikan perlindungan kenderaan yang boleh dipercayai untuk kemudahan perubatan.
Terletak di dalam taman perindustrian Guangzhou, pemasangan PVDF rasuk-I ini melindungi zon tempat letak kereta seluas 1673㎡ daripada cahaya matahari yang terik. Carport Membran ini memberikan rintangan UV yang boleh dipercayai dan teduhan tahan lama untuk penyimpanan kenderaan komersial.
Minta
Sebutharga Projek

Kongsi keperluan seni bina tensil anda dengan kami. Pakar kejuruteraan kami akan menyemak projek anda dan menyediakan penyelesaian awal yang disesuaikan dalam masa 24 jam.

Beritahu kami tentang projek anda

Pop Up Borang Pertanyaan

100% Selamat & Sulit

×
Sokongan
Pasukan Sokongan
               

Helo! 👋 Bagaimana kami boleh membantu anda hari ini?

WhatsApp
Hubungi Kami Sekarang
Sokongan E-mel
WhatsApp Panggil Pertanyaan E-mel