Heesung Electronics Loading Area Canopy
Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.
Emplacement
Guangzhou, Chine
Couverture (M²)
1250㎡
Vitesse du vent
120 km/h
Date complète
04/2020
Aperçu du projet
Project Location: Heesung Electronics Factory, Guangzhou
Coverage Area: 1250 square meters
Completion Year: 2020
Building Type: Curved Tensile Membrane Corridor Canopy
Project Background: As a large-scale electronics manufacturing enterprise, the factory has a massive logistics throughput. To ensure that goods are protected from heavy rain and scorching sun during loading and unloading, and to guarantee all-weather efficient logistics operations, the client urgently needed to construct a large-area sunshade and rain-proof canopy at the loading area in front of the factory building.
Visualisation du dessin
Visualisation avant fabrication
Design & Rendu
Défi - Solution
Challenge 1: Restricted Workspace & Ultra-Large-Scale Lifting
The on-site space in the factory’s loading area was narrow and adjacent to buildings already in use. The traditional full-scaffold, high-altitude piecemeal assembly method would not only be highly inefficient but also severely disrupt the factory’s daily operations.
Jutent Solution: Segmented Ground Pre-Assembly & Integral Lifting
Faced with a massive 1250-square-meter structure, our engineering team developed a scientific modularization strategy. We logically divided the entire steel structural framework into three independent modules, completing high-precision pre-assembly in an open area on the ground. Subsequently, using heavy lifting equipment, these three major modules were hoisted and positioned individually. This solution perfectly overcame the site constraints, drastically reduced high-risk aerial work, and significantly boosted installation efficiency.
Challenge 2: Waterproofing & Drainage at the New/Old Building Junction
One side of the corridor canopy was closely attached to the exterior wall of the existing factory building. Guangzhou experiences abundant rainfall in the summer; improper drainage design could easily lead to rainwater backflow or water accumulation eroding the original building.
Jutent Solution: Customized Wall-Mounted Gutter Drainage System
During the structural design phase, Jutent engineers conducted in-depth node detailing specifically for the wall-adjacent edge. We customized and installed a dedicated drainage gutter that perfectly integrated with the membrane structure. Through precise slope calculations, we ensured that the rainwater collected by the canopy could be swiftly and systematically channeled into the underground drainage network, completely eliminating waterproofing risks at the wall junction of the large-span membrane structure.
Installation - Support
Industrial-Grade Weather-Resistant Membrane: The canopy utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. This material boasts exceptional tear strength and self-cleaning properties, enabling it to resist dust settlement in industrial environments over the long term while providing outstanding sunshade and thermal insulation for the loading area.
Precision Factory Fabrication & On-Site Installation: All core steel components underwent pre-fabrication and anti-corrosion coating within the Jutent factory. During the intense lifting and tensioning phases, Jutent dispatched senior installation engineers for full-process on-site supervision. They strictly controlled and supervised the technical and safety aspects of every stress node and membrane tensioning step, ensuring the high-quality delivery and commissioning of the project in 2020.
| Spécification | ||
|---|---|---|
| Fabric Type | PVDF | |
| Type de structure | Structure en treillis | |
| Charge de conception | 120 km/h | |
| Durée de vie de conception | 25-30 ans | |
| Garantie | 10 ans | |
Obtenez une conception & un devis gratuits
Nos ingénieurs vous répondront sous 24 heures
Contacter via WhatsApp
Projets connexes
Les opérations de chargement industriel à Hanoï sont optimisées par cette installation PVDF à pics connectés couvrant 630 m². L'auvent en toile de type Eave Canopy assure un drainage efficace des eaux de pluie et une protection durable pour les zones de poids lourds.