Heesung Electronics Loading Area Canopy

Engineered a tensile canopy for Heesung's loading area. By using modular lifting in tight spaces and custom wall gutters, we ensured all-weather logistics.

Lokasi

Guangzhou, China

Liputan (M²)

1250㎡

Kelajuan Angin

120 km/j

Tarikh Siap

04/2020

Realiti Projek

Galeri Foto Struktur Siap
Gambar Kes

Gambaran Keseluruhan Projek

Project Location: Heesung Electronics Factory, Guangzhou Coverage Area: 1250 square meters Completion Year: 2020 Building Type: Curved Tensile Membrane Corridor Canopy Project Background: As a large-scale electronics manufacturing enterprise, the factory has a massive logistics throughput. To ensure that goods are protected from heavy rain and scorching sun during loading and unloading, and to guarantee all-weather efficient logistics operations, the client urgently needed to construct a large-area sunshade and rain-proof canopy at the loading area in front of the factory building.

Visualisasi Lukisan

Visualisasi sebelum fabrikasi
Reka Bentuk & Render

Cabaran - Penyelesaian

Challenge 1: Restricted Workspace & Ultra-Large-Scale Lifting The on-site space in the factory’s loading area was narrow and adjacent to buildings already in use. The traditional full-scaffold, high-altitude piecemeal assembly method would not only be highly inefficient but also severely disrupt the factory’s daily operations. Jutent Solution: Segmented Ground Pre-Assembly & Integral Lifting Faced with a massive 1250-square-meter structure, our engineering team developed a scientific modularization strategy. We logically divided the entire steel structural framework into three independent modules, completing high-precision pre-assembly in an open area on the ground. Subsequently, using heavy lifting equipment, these three major modules were hoisted and positioned individually. This solution perfectly overcame the site constraints, drastically reduced high-risk aerial work, and significantly boosted installation efficiency. Challenge 2: Waterproofing & Drainage at the New/Old Building Junction One side of the corridor canopy was closely attached to the exterior wall of the existing factory building. Guangzhou experiences abundant rainfall in the summer; improper drainage design could easily lead to rainwater backflow or water accumulation eroding the original building. Jutent Solution: Customized Wall-Mounted Gutter Drainage System During the structural design phase, Jutent engineers conducted in-depth node detailing specifically for the wall-adjacent edge. We customized and installed a dedicated drainage gutter that perfectly integrated with the membrane structure. Through precise slope calculations, we ensured that the rainwater collected by the canopy could be swiftly and systematically channeled into the underground drainage network, completely eliminating waterproofing risks at the wall junction of the large-span membrane structure.

Pelaksanaan di Tapak

Fasa Fabrikasi & Pemasangan
Proses Pembinaan

Pemasangan - Sokongan

Industrial-Grade Weather-Resistant Membrane: The canopy utilized a heavy-duty 1050g/㎡ PVDF architectural membrane. This material boasts exceptional tear strength and self-cleaning properties, enabling it to resist dust settlement in industrial environments over the long term while providing outstanding sunshade and thermal insulation for the loading area. Precision Factory Fabrication & On-Site Installation: All core steel components underwent pre-fabrication and anti-corrosion coating within the Jutent factory. During the intense lifting and tensioning phases, Jutent dispatched senior installation engineers for full-process on-site supervision. They strictly controlled and supervised the technical and safety aspects of every stress node and membrane tensioning step, ensuring the high-quality delivery and commissioning of the project in 2020.
Spesifikasi
Jenis Fabrik PVDF
Jenis Rangka Struktur Kekuda
Beban Reka Bentuk 120 km/j
Hayat Reka Bentuk 25-30 Tahun
Jaminan 10 Tahun

Dapatkan Reka Bentuk & Sebut Harga Percuma

Jurutera kami akan membalas dalam masa 24 jam
Borang Pertanyaan Portfolio
Hubungi Melalui Whatsapp

Projek Berkaitan

Operasi pemuatan industri di Hanoi dioptimumkan oleh pemasangan PVDF puncak bersambung ini meliputi 630㎡. Kanopi Cucur Atap Fabrik memastikan saliran air hujan yang cekap dan perlindungan tahan lasak untuk zon trak tugas berat.
Minta
Sebutharga Projek

Kongsi keperluan seni bina tensil anda dengan kami. Pakar kejuruteraan kami akan menyemak projek anda dan menyediakan penyelesaian awal yang disesuaikan dalam masa 24 jam.

Beritahu kami tentang projek anda

Pop Up Borang Pertanyaan

100% Selamat & Sulit

×
Sokongan
Pasukan Sokongan
               

Helo! 👋 Bagaimana kami boleh membantu anda hari ini?

WhatsApp
Hubungi Kami Sekarang
Sokongan E-mel
WhatsApp Panggil Pertanyaan E-mel