GUANGZHOU International Air Cargo Terminal Parking Canopy

Delivered a 463㎡ tensile membrane parking canopy for the Guangzhou International Air Cargo Terminal. Engineered to high wind and snow resistance standards, we overcame complex concurrent construction to achieve efficient, early delivery.

Localização

Guangzhou, China

Cobertura (M²)

463㎡

Velocidade do Vento

160 km/h

Data de Conclusão

07/2022

Realidade do Projeto

Galeria de Fotos da Estrutura Concluída
Fotos do Caso

Visão Geral do Projeto

Project Overview Project Location: Guangzhou International Air Cargo Terminal Coverage Area: 463 square meters Building Type: Large-Span Tensile Membrane Parking Shed Project Background: As a high-turnover international aviation logistics hub, the site urgently required an expanded sheltered space capable of accommodating large freight trucks for parking and dispatching. The project presented extremely stringent requirements for safety, construction efficiency, and space utilization.

Visualização do Desenho

Visualizando antes da fabricação
Design & Renderizações

Desafio - Solução

Challenge 1: Stringent Load Requirements & Demand for Large-Span Column-Free Space The site demanded an obstruction-free interior to facilitate the smooth entry and exit of large freight vehicles. Simultaneously, due to local climate factors, the structure had to comply with exceptionally high safety standards for wind and snow load resistance. Jutent Solution: We utilized a combination of high-strength structural steel and premium architectural membranes, engineering a high wind-and-snow-resistant structural system through precise form-finding and mechanical calculations. After a thorough analysis of the site’s logistical flow, we innovatively optimized the overall stress model by purposefully adding structural columns to the rear row of the parking shed. This design perfectly adapted to the boundary limits without interfering with vehicle movement, while multiplying the overall structural stability of this 463㎡ large-span canopy. Challenge 2: Extremely Tight Schedule & Complex Concurrent Construction Conditions The project demanded delivery within an exceptionally short timeframe. More critically, the foundation construction of the tensile membrane parking shed had to proceed simultaneously with a concrete retaining wall project managed by another contractor. Jutent Solution: We implemented full-process interface coordination management. Our engineering team proactively front-loaded the coordination process, establishing a dynamic communication mechanism with the retaining wall contractor. By precisely delineating construction interfaces and working windows, we completely eliminated on-site scheduling conflicts.

Execução no Local

Fases de Fabricação & Instalação
Processo de Construção

Instalação - Suporte

Throughout the installation phase, Jutent demonstrated outstanding technical management and on-site execution: Modular Prefabrication & Assembly: To adapt to the restricted on-site working area, we adopted a strategy of “factory prefabrication + on-site modular assembly.” This significantly minimized on-site welding and cutting operations. Efficient Delivery: Backed by meticulous construction organization and on-site support from our professional technical team, we not only successfully overcame the complex environment of “building the wall and erecting the canopy simultaneously,” but ultimately completed the tensioning, anchoring, and delivery of all membrane materials 5 days ahead of schedule. The completed structure features smooth tension curves and maximized space utilization, winning high praise from the client.
Especificação
Tipo de Tecido PVDF
Tipo de Estrutura Estrutura de Pórtico
Carga de Projeto 160 km/h
Vida Útil de Projeto 25-30 Anos
Garantia 10 Anos

Obter Design e Orçamento Grátis

Nossos engenheiros responderão em até 24 horas
Portfólio do Formulário de Consulta
Contato via Whatsapp

Projetos Relacionados

Instalada em uma instalação corporativa em Huizhou, esta estrutura em forma de 7 com viga I e membrana PVDF garante armazenamento seguro de veículos em 463㎡. O Sombreador de Estacionamento com Membrana PVDF oferece uma solução de sombreamento econômica e com classificação de resistência ao fogo para locais industriais.
Localizada em um parque industrial em Dili, esta instalação de PVDF multizona protege 2100㎡ de estacionamento dos elementos tropicais. O Sombreador de Estacionamento Comercial utiliza estruturas em balanço para suportar ventos de 180 km/h e proporcionar segurança veicular de longo prazo.
Esta instalação de PVDF com viga I de duplo cantilever em Shaoguan cobre 863㎡ de estacionamento hospitalar. A Estrutura de Sombreamento para Estação de Carregamento de VE suporta ventos de 120 km/h para garantir proteção confiável de veículos para instalações médicas.
Localizada em um parque industrial de Guangzhou, esta instalação de PVDF com viga I protege uma zona de estacionamento de 1673㎡ da luz solar intensa. O Carport de Membrana oferece resistência UV confiável e sombreamento durável para armazenamento comercial de veículos.
Solicite um
Orçamento de Projeto

Compartilhe seus requisitos de arquitetura tênsil conosco. Nossos especialistas em engenharia revisarão seu projeto e fornecerão uma solução preliminar personalizada em até 24 horas.

Conte-nos sobre seu projeto

Formulário de Consulta Pop Up

100% Seguro & Confidencial

×
Suporte
Equipe de Suporte
               

Olá! 👋 Como podemos ajudá-lo hoje?

WhatsApp
Ligue Agora
Suporte por E-mail
WhatsApp Ligar Consulta E-mail